General Contractor
Ssangyong Engineering &
Construction Co Ltd
Client
Pidemco Land Limited
Engineer
Maunsell Consultants
Architect
RSP Architects Planners &
Engineering (Pte) Ltd
Total Tonnage
9900
Subcon Start Date
1.6.98
Subcon Completion Date
31.5.99 |
The Group was awarded the supply, fabrication and erection of the steel frame and installation of steel decking for the Capital Tower at Robinson Road. The total tonnage of the frame is approximately 9,600 tonnes. The tubular steel columns which are concrete-filled were also rolled and welded in the Group's Singapore factories. The provision of temporary strutting work and access platform was awarded as another sub-contract prior to the main superstructure construction start.
|