General Contractor
Tuan Kai Construction Pte Ltd
Client
Springleaves Tower Ltd
Engineer
Chong & Lee Consultants
Architect
Lee Sian Teck Chartered
Architects
Designer
Hyder Consulting Pte Ltd
Total Tonnage
2600
Subcon Start Date
22.7.97
Subcon Completion Date
7.7.99 |
The contract for the design, supply, fabrication and erection of the frame for this 37-storey office tower was awarded to the Group. In addition, the temporary work for strutting and soldier piles for the basement construction were separately awarded.
The project also included the design, supply and installation of the steel floor decks together with the structural fire protection of exposed steel.
Structural fire protection by: Rushoe Corporation Pte Ltd.
|